Bulverde Ride
The routes from this location include plenty of rolling hills! The ride starts at the Bulverde City Park on Bulverde Lane, across from the Bulverde airport.
Take US 281 North to the FM 1863/Bulverde exit. Turn left, go less than 2 miles on Bulverde Road, and turn left on Bulverde Lane.
GPS Routes
Short routes
16 miles | Very Hilly | Category D or C | 1 rest stop (counterclockwise)
35 miles | Very Hilly | Category C or B | 1 rest stop (counterclockwise)
Includes Rebecca Creek
41 miles | Hilly | Category B or A | (counterclockwise)
53 miles | Hilly | Category A | (clockwise)
Through Kendalia
49 miles | Very Hilly | Category A | (clockwise)
55 miles | Very Hilly | Category A | (counterclockwise)
63 miles | Very Hilly | Category A | (counterclockwise)